La Cueva MDWCA                                                                                                                                                                           

                                         Owner

 

HC 74 Box 11, Pecos, NM 87552                                                                                                                                                

                                        Address

 

Separate sealed BIDS for the construction of the La Cueva MDWCA Water System Improvements Phase 2 Project will be received by Souder, Miller & Associates, Attn: Keaton Chancellor at 2904 Rodeo Park Dr, Building 100, Santa Fe, NM 87505 until 2:00 p.m. (Local Time), on Thursday, August 18, 2022, and then at said office publicly opened and read aloud.

 

Project Description:  This project consists of the installation of a public water supply well, a pre-manufactured duplex booster pump station, pre-engineered metal building to house the associated well plumbing manifold, booster station, and chlorination equipment, associated electrical work and controls instrumentation, tank site piping, and site grading improvements.

 

The Bidding Documents may be examined at the following locations:

 

  •     Construction Reporter, 4901 McLeod Rd. NE Suite 200A, Albuquerque, NM  87109                            (505) 243-9793
  •     Dodge Data & Analytics at: www.construction.com                                                                         (800) 393-6343
  •     Souder, Miller & Associates, 5454 Venice Ave. NE, Suite D, Albuquerque, NM  87113                         (505) 299-0942                                                                                                                                                                                                       
 

Copies of the Bidding Documents in electronic media format may be obtained at the website of the ENGINEER, Souder, Miller & Associates, at www.soudermiller.com, at no cost.  Bidders are responsible for monitoring the website referenced above for notifications of changes and addenda related to this project.

 

Resident Contractor and Resident Veteran Contractor Preferences shall apply to this Project per Section 13-1-21 NMSA 1978 (as amended).

 

A MANDATORY PRE-BID MEETING will be held at the Intersection of Los Altos de Cicuye and NM State Road 50, next to Pecos Propane on August 3, 2022 at 10:00 a.m.