• Bid Number: IFB 20-07
  • Office: Roswell
  • Project Manager: Jesus Avitia
  • Deadline: 2020-10-26
  • Last Updated: 2020-10-07 15:54:58
  • Downloadable Files: 4 file(s) available

This project consists of the rehabilitation of Red Rd./Campbell Rd. and includes 2in HMA over existing, Double Pen Chipseal, striping, reshaping the roadside ditches for drainage, 4 cattle guards, and traffic control.