• Bid Number: 2017-21
  • Office: Roswell
  • Project Manager:
  • Deadline: 2017-11-02
  • Last Updated: 2017-10-02 13:30:53
  • Downloadable Files: 5 file(s) available

The project work will include a 3-lane roadway with 2 travel lanes, bicycle lanes and a center left turn lane from beginning of project (BOP) to end of project (EOP).  Subgrade preparation, base course, hot mix asphalt, concrete curb and gutter, drive pads, ADA accessible ramps and sidewalks, street lighting, traffic control, underground storm drain with manholes and curb drop inlets, 12" water line, and miscellaneous construction.