• Bid Number: 6124846-1
  • Office: Farmington
  • Project Manager:
  • Deadline: 2018-05-01
  • Last Updated: 2018-03-28 17:39:27
  • Downloadable Files: 17 file(s) available

The Project consists of water well rehabilitation, CMU building addition, furnish and install water treatment systems capable of treating water to acceptable levels of arsenic, iron, and manganese for domestic consumption. Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) applies an American Iron and Steel requirement to this project.  All iron and steel products used in this project must be produced in the United States.  The term “iron and steel products” means the following products made primarily of iron and steel: lined or unlined pipes and fittings, manhole covers and municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials.  [DMJ1] Bids will be received for a single prime Contract.  Bids shall be on a lump sum and unit price basis, with additive alternate bid items as indicated in the Bid Form.


 [DMJ1]Check with Eric.  Add in C-800 para if so.