San Jose Boulevard Road Improvements

  • Bid Number: 7220706
  • Deadline: 2012-05-24 00:00:00
  • Last Updated: Updated Tue, May 1st, 2012 3:12 pm
  • Downloadable Files: 5 files available

Project Description: The project will include a 3-lane roadway with 2 travel lanes, bicycle lanes, and a center left turn lane from BOP to EOP. New curb and gutter and sidewalk will be installed on both sides of the roadway. Sidewalks, driveways, and intersections will be constructed to be ADA compliant. Improvements will also include installing underground storm drain with curb inlets, and reconstructing several intersections, including Harper, Wood and Fiesta. A prepared SWPPP will be provided by SMA. Contractor will be responsible for acquiring all permitting, maintenance of SWPPP, and erosion control.