- Bid Number: 6B29849
- Office: Las Cruces
- Project Manager: Marty Howell
- Deadline: 2022-11-13
- Last Updated: 2022-10-31 15:01:29
- Downloadable Files: 9 file(s) available
ADVERTISEMENT FOR BIDS
Hondo Valley Public School District
Owner
111 Don Pablo Ln., Hondo, NM 88336
Address
Separate sealed BIDS for the construction of the Hondo Valley Public School District Water Storage Improvements Project will be received by Martin Howell, P.E. at 3500 Sedona Hills Parkway, Las Cruces, NM 88011 until 2:00 p.m. (Local Time), on October 13, 2022, and then at said office publicly opened and read aloud.
Project Description: This project consists of constructing a new 136,000-gallon welded steel water storage tank, booster station in a pre-manufactured building, school bus drop-off loop, and associated site work.
The Bidding Documents may be examined at the following locations:
Souder, Miller & Associates, 3500 Sedona Hills Parkway, Las Cruces, NM 88011 (575) 647-0799
Copies of the Bidding Documents in electronic media format may be obtained at the website of the ENGINEER, Souder, Miller & Associates, at www.soudermiller.com, at no cost. Bidders are responsible for monitoring the website referenced above for notifications of changes and addenda related to this project.
Copies of the Bidding Documents may be obtained at the office of the ENGINEER, Souder, Miller & Associates, 3500 Sedona Hills Pkwy., Las Cruces, NM 88011, upon payment of $100.00 for each set. Checks for Bidding Documents shall be payable to the Owner, identified above. Any BIDDER, upon returning the Bidding Documents in good and complete condition within 30 calendar days of bid opening, will be refunded $100.00.
Resident Contractor and Resident Veteran Contractor Preferences shall apply to this Project per Section 13-1-21 NMSA 1978 (as amended).
A PRE-BID MEETING will be held at 111 Don Pablo Ln., Hondo, NM 88336 on September 22, 2022, at 11:00 a.m. (Local Time).